Highway 401 Eastbound from Victoria Park Avenue to Neilson Road

Ministry of Transportation Contract #2026-2004

Project Background

Key Components of the Construction Contract include:

  • Rehabilitation of seven existing bridges along Highway 401 Eastbound included:

    • Birchmount Road Overpass Bridge

    • Kennedy Road Overpass Bridge

    • Midland Avenue Overpass Bridge

    • Brimley Road Underpass Bridge

    • McCowan Road Ramp-Consilium Place Underpass Bridge

    • Markham Road Overpass Bridge

    • Progress Avenue Underpass Bridge

  • Replacement of two existing bridges along Highway 401 Eastbound included:

    • Highway 401 Eastbound bridges over CPKC Railway Corridor

    • Highway 401 Eastbound bridges over CNR / Metrolinx Railway Corridor

  • Rehabilitation of three existing structural culverts under Highway 401 included:

    • West Highland Creek Culvert

    • East Highland Creek Culvert

    • Highland Creek Culvert

  • Repairs to an existing retaining wall located east of Kennedy Road along Highway 401 Eastbound;

  • Replacement of Highway 401 Eastbound median;

  • Pavement and concrete base repairs along Highway 401 Eastbound Collector and Express lanes;

  • Drainage upgrades, including new storm sewer systems along Highway 401 Eastbound;

  • Rehabilitation of the Highway 401 Eastbound interchange ramps at Warden Avenue, Kennedy Road, Brimley Road, McCowan Road, Corporate Drive, Markham Road, and Progress Avenue;

  • Construction of an additional Highway 401 Eastbound Collector lane through the Kennedy Road interchange;

  • Relocation of the existing Highway 401 Eastbound Express to Collector transfer from its current location east of Warden Avenue to east of the Kennedy Road off-ramp;

  • Removal of the channelized right-turn at the Markham Road off-ramp terminal;

  • Replacement of Overhead highway signs;

  • Installation and upgrades to highway and roadway lighting;

  • Replacement of traffic signals and upgrades to highway traffic management systems;